Course Details

WELL COMPOSITE CONSTRUCTION INTEGRITY & COMPLETION

Location
London, UK
Date
From Date:  16-Oct-2023   To Date:     20-Oct-2023
Duration
5 Days
Language
English
Discipline
Drilling & Reservoir
Introduction

During the course, the participants will review and discuss the requirements of operators and regulatory authorities for integrity assurance in wells and production facilities. They will also gain knowledge in the completion techniques and design of wells in increasingly complex field developments to ensure well integrity and failure-free, long-life production.

Objective

• Increase the life and value of old wells with new and proven technology.

• Ensure accurate data collection for reliable well completions and future well integrity.

• Restore high productivity level of wells with innovative intervention techniques.

• Define well barriers including the various types, well barrier design, selection and construction principles and high risk well.

• Specify components and equipment needed for well integrity.

• Identify best practices available to extend the life of equipment and production facilities including the operations integrity management and the well intervention procedures.

• Apply basic design and analysis concepts for well integrity.

 

Audience

Production engineers, petroleum engineers, well integrity engineers and production operators who are responsible for maintaining production periodically.

Content

1st Day

Casing Design

• Reasons for running casing

• Forces affecting on casing (burst, collapse and tension)

• Safety factor during casing design

• How to design casing string

2nd Day

Completion Design

Completion at the reservoir      

Open hole (barefoot) completion       

Un-cemented liner completions  

Cased and cemented completions      

Gun types and perforation methods   

3rd Day

Completion Design

Well inflow performance

Vertical lift performance

Functional requirements of a completion string        

Completion components descriptions   

• Landing nipples

• Barriers types

Safety valves

• Wellhead types   

4th Day

Cement and Casing Evaluation

• Factors affecting cement quality         

• Cement evaluation

• Casing Evaluation 

• Cased Hole logging(CBL-VDL, USIT, PMIT)

5th Day

Management of Sustained Annulus Pressure

• Well integrity

• Annulus pressure monitoring & data gathering

• Data quality control

• Relationship of pressure readings to the annulus pressure limits

• Criteria to prioritize wells with high annuli pressure for investigation

• Bleed-off and diagnostic testing procedures

• Bleed-down / build-up test operational steps

• Analysis of the bleed down/build up test

• Actions following bleed-down and build-up tests

• Bleed down/build up test operations

• Data verification

• Well remediation options

• Risk assessment

Certificate

MAESTRO CONSULTANTS Certificate of Completion for delegates who attend and complete the training course

Methodology

Our courses are highly interactive, typically taking a case study approach that we have found to be an effective method of fostering discussions and transferring knowledge. Participants will learn by active participation during the program through the use of individual exercises, questionnaires, team exercises, training videos and discussions of “real life” issues in their organizations.
The material has been designed to enable delegates to apply all of the material with immediate effect back in the workplace.

Fees
$6,500